Los Alamos Unitarian Church Demo

Lee Craven All, Construction, Demolition, Grading, Uncategorized, Work 0 Comments

So this was the end result of the demo, total time was 2 ½ hours from start to finish to drop the building, time lapse was set to 1 photo per 10 seconds, it was quick n dirty and as you can see and I forgot my GoPro case and the rain came.

As of this post we have almost got the new building pad fully excavated, another day or two and we will be putting lifts back in and prepping the building pad for foundation work. This has been a fun project so far with little to no major issues, we encountered a few delays at the beginning with the utilities (out of our hands) but after that we have been trouble free for the most part. I’ll snap some images of the over excavation this week and update this post with them.

And if you’re curuious, this is what will replace the former building:

Architect's rendering of the new Unitarian Church of Los Alamos. Courtesy/Mullen|Heller Architecture

Architect’s rendering of the new Unitarian Church of Los Alamos. Courtesy/Mullen|Heller Architecture

Lee Craven – clearly a tormented man, born and raised in Leeds, England blindly chasing the American dream. Attempting to keep up with technology and gadgets. A commercial demolition operator by day, professional procrastinator by night although when able dabbles in a little programming, web design and photography.

Share this:
  •  
  •  
  •  
  •  
  •  
  •  
  •  

Leave a Reply